What to include in a finishes schedule and how to keep it current (UK)
What a UK finishes schedule should hold, how it differs from your FF&E schedule, and a simple way to keep paint, tile, flooring and ironmongery specs in step through a project.
The Aalto teamUpdated
Short answer. A finishes schedule lists every surface finish on a project, room by room and surface by surface, covering walls, floors, ceilings, joinery, tiling and ironmongery. Each line carries a finish code, the product and supplier, the colour or size, and where it goes. Keep it separate from your FF&E schedule but use the same rooms and the same codes, so a contractor and a client read the same project.
Finishes schedule or FF&E schedule?
Your FF&E schedule covers the loose and fitted items you specify, such as furniture, lighting, fixtures and accessories. Your finishes schedule covers what goes onto the building itself. Paint, wallpaper, tiles, flooring, worktops, joinery finishes, sanitaryware finishes and door furniture usually sit here.
The two overlap at the edges. A bathroom tap can live on either. Pick one home for each category at the start of the project and stick to it. Contractors lose time when the same tap appears on two schedules with two different codes.
What to include on each line
Give every line the same columns, in the same order:
- Finish code (for example PT-01 for the first paint, FL-02 for the second floor finish)
- Room or area
- Surface or location (walls, ceiling, skirting, floor, splashback)
- Product name and manufacturer
- Colour, finish or size (for example eggshell, honed, 600 x 300 mm)
- Supplier and product link
- Quantity or area, if you're responsible for ordering
- Unit price and the date you captured it
- Notes for the installer (laying pattern, grout colour, sealant)
- Status (proposed, approved, ordered)
The finish code is the part that does the most work. It appears on your drawings, on the schedule and on any sample board. When the client changes their mind about the kitchen floor, you change one line and the code still points to the right place on every drawing.
How UK studios usually structure it
Most small studios work room by room, then surface by surface. A typical sequence for each room is floor, walls, ceiling, joinery, then ironmongery and accessories. Contractors and decorators read the schedule in that order on site, so following it saves questions.
Larger practices and architects may use a specification system such as NBS. If you're working alongside an architect who does, ask early which finishes they'll specify and which you will. Write that split into your scope so it's agreed before work starts.
If you also prepare the FF&E schedule, match the room names exactly. "Kitchen / Dining" on one sheet and "Kitchen" on the other is how items go missing.
Prices and VAT on a finishes schedule
Many UK trade suppliers quote prices ex VAT, while retail sites show prices inc VAT. Keep your finishes prices ex VAT, like your FF&E prices, and add VAT in its own column. Our guide on how to show VAT on an FF&E schedule (UK) covers the column layout, and it works the same way here.
Finishes prices move too. Tile ranges get discontinued, and paint brands change their prices. Note the date you captured each price. Before you send the schedule for sign-off, recheck anything that's more than a few weeks old.
Where finishes schedules go wrong
- Codes drift. The drawing says PT-03 and the schedule says PT-04. Keep one master list of codes and update drawings from it.
- Samples and schedule disagree. The client approved a sample in a different finish from the one on the schedule. Record the exact finish name and the date the sample was approved.
- Links go missing. A screenshot of a tile without its supplier page means a hunt three months later when the contractor needs a lead time.
- Discontinued products. A finish that was in stock at concept stage isn't there at order stage. Check availability again before you issue.
- Too many versions. You end up with "Finishes_v7_final_FINAL.xlsx" on three laptops. Keep one working version and export a dated copy when you issue it.
A routine for keeping it current
- Set up the rooms first, using the same names as your drawings and your FF&E schedule.
- Give each finish a code as soon as it's a real option, not only when it's approved.
- Save every finish with its supplier link and price at the moment you find it.
- Mark each finish as proposed, approved or ordered as you go.
- Recheck prices and availability on approved finishes before you issue the schedule.
- Export a dated copy each time you issue it, and keep working in the same version.
If you'd like a starting point for single products, our free product spec sheet template gives you the fields for one item. The FF&E schedule template gives you the full project layout.
Doing this in Aalto
Aalto is a product library for interior designers. You save products from any supplier site into one visual library that spans all your projects, and that includes finishes as well as furniture. A tile, a paint colour or a door handle saved once can be reused on the next job without hunting for the link again.
When you save from a supplier page with the Aalto extension, it captures the name, brand, price, image and supplier link in one click, and keeps the spec sheet when the page links one. Aalto records the price at the moment you save. On an active project, it rechecks the price of shortlisted and ordered pieces each week and records any change, and you can refresh any product yourself before you issue a schedule. Some supplier sites can't be read automatically, so refresh before you quote if the figure matters.
Inside a project, give each room its own section so your finishes sit with the room they belong to. Status (saved, shortlisted, ordered, delivered, installed) shows what's still an option and what's been ordered.
If your workspace tax region is set to United Kingdom, your project table shows prices and line totals ex and inc VAT, on Free and Pro. When it's time to issue, export a CSV on any plan, or an Excel file or PDF Lookbook on Pro. See how to export an FF&E schedule for the steps.
Aalto focuses on sourcing and organising products. It doesn't replace drawings, a full NBS specification, or procurement and invoicing software. You'd use it alongside those.
Frequently asked questions
What is a finishes schedule in interior design?
A list of every surface finish on a project, organised by room and surface, with a code, product, supplier, colour or size and location for each line. Contractors and decorators use it to order and install the right finish in the right place.
Should finishes and FF&E be on the same schedule?
You can combine them on a small residential job. On anything larger, keep two schedules that share room names and codes. It keeps each one readable for the people who use it.
How do I code finishes?
A common studio approach is a short prefix for each category plus a number, such as PT for paint, WC for wall coverings, FL for flooring, TL for tiles and IM for ironmongery. Pick one set, use it on every project, and put the same code on your drawings and your samples.
Should a finishes schedule show prices ex VAT or inc VAT?
Keep working prices ex VAT with VAT in its own column, then show residential clients the inc VAT total. Check anything specific to your business with your accountant.
Does Aalto keep finish prices current by itself?
For pieces you've shortlisted or ordered on an active project, Aalto rechecks the price each week and records any change. You can also refresh any product on demand. Refresh before you quote if the price matters.