Free FF&E schedule template

The Aalto teamUpdated CSV · Free

An FF&E schedule lists every piece of furniture, fixture, and equipment on a project with its supplier, dimensions, quantity, price, and lead time. This free template gives you those columns already set up, with a worked example row and a guide to what belongs in each one.

Download the CSV template

Free, no sign-up required. Opens in Excel, Numbers, and Google Sheets.

What to include in an FF&E schedule

01

Room and Item number

Groups the schedule the way a site walk-through happens, and gives every line a reference to quote in emails and on drawings.

02

Product name, Brand, Supplier, SKU

The identifying set. SKU and supplier are what a procurement team needs to actually place the order.

03

Category and Colour or finish

Lets you filter the schedule by trade package and check a palette across rooms.

04

Dimensions and Weight

Length, width, height, and weight decide whether a piece fits the space, the lift, and the floor loading.

05

Quantity, Unit price, Line total

The budget spine of the schedule. Line total is quantity times unit price, and the column that clients read first.

06

Lead time and Availability

The most common cause of a late install. Capture it at specification, not at order.

07

Source URL

The fastest way to re-check a price or stock level months later, and the column most schedules forget.

08

Status and Notes

Tracks each item from proposed to delivered, and holds the client decision that explains the choice.

How to keep the schedule accurate

01

Group by room, then number every item

Work room by room and give each item a sequential number. A stable reference makes client conversations and site queries far quicker.

02

Capture the source as you specify

Paste the product URL into the row the moment you choose it. Rebuilding sources at the end of a project is the slowest part of the job.

03

Keep one currency per schedule

Mixing currencies in one total is where budgets drift. If you must mix, add a converted total column and note the rate and date.

04

Review lead times before you present

Sort by lead time before a client meeting. Anything long enough to threaten the install date should be flagged in the same conversation as the price.

Frequently asked questions

What is an FF&E schedule?

An FF&E schedule is the document that lists every piece of furniture, fixture, and equipment specified for a project, with its supplier, dimensions, quantity, price, and lead time. It is what a client approves and what a procurement team orders from.

What should an FF&E schedule include?

At minimum: room, item number, product name, brand, supplier, SKU, dimensions, quantity, unit price, line total, lead time, and status. Add the source URL so any price or availability can be re-checked later.

Is this FF&E template free?

Yes. The CSV template on this page is free to download and use on client projects, with no sign-up required. It opens in Excel, Numbers, and Google Sheets.

How do I keep an FF&E schedule up to date?

The manual answer is a disciplined weekly pass over prices, lead times, and statuses. The faster answer is to keep the products in a tool that stores the source with each item, so the schedule exports from live data instead of being retyped.

Can I generate an FF&E schedule automatically?

Yes. Aalto captures the price, supplier, dimensions, and source URL when you save a product, then exports the selection to CSV, XLSX, or PDF, so the schedule is generated from what you specified.